To establish a CCS factory, the following requirements are needed:
● Land: Minimum of 50,000 sq ft, including 30,000 sq ft under cover for factory space.
● Production Capacity: 100-150 homes annually, scalable to meet local demand.
● Local Workforce: Factories create 20 full-time jobs directly, plus 20-35 additional jobs for
trades and suppliers.
● $500,000 setup costs (hybrid cash component and land / factory injection-for-equity value)
● Landowners: Provide suitable land in exchange for equity and participation in housing
development projects.
● Trades Businesses: Join our network to secure guaranteed contracts and equity options.
● Local Governments: Collaborate with us on infrastructure support and incentives to
maximize community benefits.
● $500,000 setup costs (hybrid cash component and land / factory injection-for-equity value)